Constant Load Hanger

Constant Load Hanger

Designed based on the moment balance principle to provide constant support force during pipe/equipment displacement.
Wide load range: 0.2–400 k N.
Minimizes additional stress, extends system lifespan, and reduces long-term maintenance costs.
Send Inquiry
Description

The constant load hanger (referred to as constant support) operates on the principle of moment balance, maintaining equilibrium between load moment and spring moment within the allowed displacement range. The constant load hanger delivers a consistent supporting force during thermal expansion or contraction of pipes and equipment, preventing additional stress and ensuring long-term safe and stable operation.

 

Product Parameters

 

Item

Common Specifications

Rated Load

0.2–400 k N

Allowable Displacement

0–508 mm

On-site Load Adjustment Range

±10%

Load Deviation Over Full Travel (incl. friction)

≤6%

Average vs. Design Load Deviation Over Full Travel

≤2%

Locking Load Capacity

2× maximum working load

 

Product Advantages

 

  1. Cost-Effective Long-Term solution: reduces stress-related failures and extends service life, lowering overall maintenance and replacement costs.
  2. High Precision & Stability: minimal load deviation (≤6%) ensures consistent performance, reducing downtime and operational risks.
  3. Easy Installation & Adjustment: pre-set at factory, simple on-site commissioning saves time and labor expenses.

 

Main Applications

 

  1. Power Industry: Main steam pipelines, thermal pipelines, and boiler auxiliary piping in power plants.
  2. Petrochemical: High-temperature and high-pressure pipelines, reactor inlet/outlet lines.
  3. District Heating Systems: Thermal compensation sections between fixed and sliding supports in urban heating networks.
  4. Industrial Piping Systems: Supports for pipes and equipment requiring thermal displacement compensation and vibration isolation.

 

FAQ

 

Q1: How is the installation load determined for constant force disc spring supports? What should be checked after installation?

A1: The installation load is provided by the design unit based on pipeline operating conditions. The indicator plate is factory-set and locked at this load. After installation, pipeline cleaning and pressure testing must be completed before removing the upper and lower positioning blocks. Before operation, ensure all blocks are removed and the indicator plate moves freely from installation to working load. Verify that displacement under working load matches the design value.

Q2: Can the load be adjusted on site? What is the allowable adjustment range?

A2: Yes, minor on-site adjustments are allowed within ±10% of the installation load. Adjustments should be made with the pipeline in a cold state, ensuring the indicator aligns with the scale. Professional operation is recommended, and the locking mechanism should be checked after adjustment.

 

Hot Tags: constant load hanger, China constant load hanger manufacturers, suppliers, factory, load adjustable spring hanger, Constant Hanger, Variable Spring Hanger Pipe Support, constant load spring hanger, variable hanger, Variable Spring Support For Piping